Work is well underway at the latest project we introduced to everyone in our last blog post. But before we show you what we have been working on, take a look at this video which shows the house as we bought it. (We will show the basement in next weeks post.)
I am sure you agree, this house has been severely neglected and needs quite a bit of love & attention. So with this, the demo phase at Westridge is almost complete.
We have completely removed the kitchen cabinets and flooring
Removed all fixtures in the hall bath (including the old cast iron tub we had hoped to keep)
Demo’d the half bath in the master bedroom
Removed all of the flooring damaged from the years of roof leaks in the front two bedrooms along with the damaged Sheetrock.
We also opened the existing kitchen/living room opening to the floor.
Even with all of this action on the inside, we were also able to secure a roofer to strip off the two layers of old roof shingles to the plywood and replaced with premium architectural shingles as well as new soffit and fascia where needed.
We appreciate your commitment in following our journey and hope you check back with us to watch the progress of this house as well as the other 3 we are currently working on. Don’t forget to hit the ‘follow’ button to get notified when a new blog is posted!!